GRINELL LONGSTREET, PMP 1170 Northwood Drive Eagan, MN 55121 313.289.4670 thelongst@gmail.com PROFESSIONAL
QUALIFICATIONS Years of experience
in project management and project controls. Have developed a passion
for learning and implementing new methodologies to solve complex problems and
increase productivity. Experience has included collaborating closely and
extensively with stakeholders/sponsors and business units to gather and
analyze requirements to ensure project deliverables are on time and under
budget; establishing good rapports with stakeholders/sponsors and team members;
and utilizing Waterfall and Agile/Scrum Methodologies to complete
projects. Initially specialized in computer information systems
development and IT project management but has since specialized in
engineering project management. Established a thorough knowledge of the
principles of program planning, engineering/design, project controls/cost
engineering, outages/clearances, right-of-way/land acquisition, permitting,
construction project management, and construction scheduling, as well as, a
good understanding of various contract types, such as cost plus, time and
material, and fixed-priced to ensure that all requirements of the contract
are applied to the project schedule. Very knowledgeable
in project management/controls tools such as Oracle Primavera P6v8/EPPM,
Oracle Portfolio Management (OPPM), Oracle Primavera Contract Management
(PCM), Oracle BI Publisher, Oracle P6 Analytics, Oracle Primavera Risk
Analysis, Oracle Unifier, MS Project/Project Server, IBM Maximo Asset
Management, Hewlett-Packard Portfolio/Project Manager (HP-PPM), Deltek Cobra,
WBS Chartpro, MS-Visio, Bid-to-Win Cost Estimate, Hard Dollar Cost Estimator,
and On-Screen Take-off. In addition, have knowledge using several
information technology tools including Oracle Databases, Oracle Primavera
SDK, UNIX, WebSphere, J2EE, and .NET; working with various software programs
including SQL Server, SharePoint and SharePoint Designer, Visual Studio,
Crystal Reports, Cognos, and SourceForge. PROFESSIONAL
EXPERIENCE Burns &
McDonnell, Inc. (At Consolidated
Edison, Inc.) New York City, NY,
USA Project Controls
Manager/Scheduler, September
2013 - PRESENT Project Controls
Manager for the Enterprise Project Management System (EPMS), a 15M project,
at Consolidated Edison of New York, Inc., which includes utility companies
ConEdison of New York City and Orange and Rockland Utilities. Responsible for
planning, executing, scheduling, reporting, implementation, configuration,
resource management for Oracle suite of applications that include Primavera
P6/EPPM, Primavera Contract Management, BI Publisher, P6 Analytics, Risk
Analysis, Primavera Portfolio Management. Manage vendors
Oracle, LoadSpring Cloud Hosting, and UMT on integration points with the
Oracle Applications, Identity Federated Services (Single Sign-On), and B2W
Cost Estimate software. Assisted in
creating standardized Project Charter; Project Execution Plan; Change Order
Guidance Document; Change Management Plan; Issue Log; Configuration
Management Plan; Schedule Management “Best Practices” Guidelines; WBS/Code
Data Dictionary; Schedule Management Plan; and Backup Management Plan.
Maintain budget, invoicing, cash flow, forecasts and accruals for EPMS
program effort. Manage a team that
converted 500 Microsoft Project (2003, 2007, and 2010) schedules to Primavera
P6v8.3 for Steam Operations, Substation Operations, and Systems and
Transmission Operations. Created conversion templates, global changes, and a
re-baseline process to improve efficiency of the conversion effort. Responsible for
providing assistance in schedule creation and updating; development of
dashboards, portals, and portfolios; designing BI Publisher and Report Wizard
reports; and KPIs for various stakeholders across both companies, ConEdison
and Orange and Rockland. Provide as needed
scheduling assistance on new substations, major substation upgrades including
installation of transformers; generators; circuit breaker replacements; and
disturbance monitoring equipment, transmission lines ranging from 64kV to
345-kV, spare equipment and outages. Manage project
controls resources (Schedulers, Estimators, and Document Controls Specialist)
and activities required to support the planning and execution of project
controls for operations for large and small scale programs/projects. Responsible for
review, analysis, reporting of findings, consulting, and briefs on
construction schedules including change fragnets, schedule updates,
integrated master schedules and schedule risks. Established cost
loaded schedule template and process for Capital 5-Year Operations and
Maintenance (O&M) and Capital Budgets. E2 Consulting
Engineers, Inc. (At the Pacific Gas
& Electric Company) San Ramon, CA, USA Sr. Project
Controls Engineer/Scheduler, April 2012 – July 2013 Continued on the
Capital Improvement Project as a member of the Gas Operations Pipeline Safety
Enhancement Program (PSEP) Project Controls Group at the Pacific Gas &
Electric Company (PG&E) that is responsible for developing, cost loading,
and schedule management of Gas Pipeline Replacements, Pipeline
Strength/Hydrostatic Testing, Pipeline Automated Valves, and Pipeline In-Line
Inspection program and construction schedules in Primavera P6V8.2. Monitored and
updated integrated project plans and schedules so that projects can be
executed in the most efficient manner possible. Assess impacts to the
critical path and near-critical activities and report to the project team. Monitored schedule
deviations and variances and assist in the developing alternate methods for
corrective action. Prepare and provide schedule progress reports, trending
charts and schedule analysis on a periodic basis. Maintained record of scope
changes, trends and variances that affected schedule performance. Conducted schedule
reviews with project team on a regular basis to ensure that accurate and
timely data is incorporated in the schedule. Analyzed schedules from
Engineering firms, General Contractors, and/or Vendors to verify schedule
integrity and evaluate logic and float paths for activity sequences to insure
constructability. Made
recommendations to manage float and (re)sequence activities (if required) to
achieve project milestone dates and interim target completion dates. Analyzed
change orders for schedule impacts. When necessary conducted thorough time
impact analysis report. Used Oracle Unifier
to management construction/contractor related information such as Requests
for Information (RFI), Transmittials, Daily Logs, Submittals, and Meeting
Minutes. Performed jobsite
walks to verify physical progress of scheduled activities. Facilitated project
scheduling meetings and planning meetings when required by the Project
Manager. PARSONS CORPORATION (At the Pacific Gas
& Electric Company) Walnut Creek,
California, USA Sr. Project
Controls Scheduler, December 2011 – April 2012 A member of the Gas
Operations Pipeline Safety Enhancement Program (PSEP) Project Controls Group
at PG&E that was responsible for planning, developing, cost loading, and
schedule management of Gas Pipeline Replacements, Pipeline
Strength/Hydrostatic Testing, Pipeline Automated Valves, and Pipeline In-Line
Inspection program and construction schedules in Primavera P6V8.1. Was responsible for interfacing with
PG&E Project Managers, Project Engineers, and Project Cost Analysts to
develop detailed, cost loaded and baseline project schedules for Gas Pipeline
Replacement projects (250 miles) in excess of $919M, Pipeline Valve
Automation projects (150 miles) in excess of $142M, Pipeline Strength/Hydrostatic
Testing projects (650 miles) in excess of $177M, and Pipeline In-Line
Inspection projects (250 miles) in excess of $44M. Responsibilities
have included interfacing with various teams and/or attend regularly
scheduled meetings for status updates on cost and percent completes, work
performed, analyzing the critical path, adjusting logic or durations, and
progressing the schedules weekly. In addition, have provided dashboards
and reports for: Key Performance Index (KPI) Scorecards, Earned Value,
Critical Path Analysis, Monthly Cash Flow, Float Analysis, Resource
Management, Histograms, Outages/Clearances, Key Milestones, Variances,
Transmission Lines, Automated Valued, In-line Inspection, and Hydrostatic
Pipe Testing. AMEC ENVIRONMENT
& INFRASTRUCTURE Oakland, CA, USA Sr. Project
Controls Scheduler/Technical Analyst, December 2009 – December 2011 Responsible for
planning, costing, and scheduling of program and construction schedules in
Primavera P6V7 for the City of San Francisco Redevelopment Agency and its
land developer, Lennar Development, for the design, demolition, and
redevelopment of the Hunters Point and Candlestick Point neighborhoods in
excess of $2B. Provide various monthly and yearly reports, cash flows,
critical path analysis, risk analysis, and PERT analysis for an integrated
master project schedule Responsible for
planning, cost estimating, and scheduling a $30M project schedule for the
demolition, waste management, and remediation of the Hunter’s Point US Navy
Shipyard for the US Navy and the City of San Francisco. Provide cash
flow and risk analysis assumptions to the US Air Force Center for Engineering
and the Environment (AFCEE) and bonding insurance company. Responsible for
planning, cost managing, scheduling, and maintaining a $5M design/build
project schedule for the construction of housing for the Border Patrol and US
Customs at Big Bend National Park for US National Park Service in Brewster
County, Texas. Produce detailed, individual project schedules and an integrated
master project schedule. Responsible for
project controls and cost scheduling of the $11M sediment remediation, soil
monitoring, water monitoring, environmental assessment for the Schlage-Lock
redevelopment project in the City of San Francisco. Work with
Brownfield Properties team to develop remediation and design/build project
schedules. Responsible for
planning, cost loading (resource, expense, and material), baseline, and the
weekly/monthly progress of the $3M San Fernando Valley’s North Hollywood
Groundwater Remedial Design project using P6V7. Provide various monthly
and yearly status reports, Critical Path Analysis, PERT Analysis, and Trend
Analysis to the Environmental Protection Agency (EPA) and Lockheed
Martin/Honeywell joint venture. WESTLAND MANAGEMENT
SOLUTIONS (At the San
Francisco Public Utilities) San Francisco, CA,
USA Sr. Project
Controls Engineer/Scheduler, July 2007 – December 2009 Conducted master
integrated scheduling for the Peninsula Region of the Public Utilities
Commission Water System Improvement Project. Responsibilities include
scheduling and managing the projects in Primavera P6.2; Worked with various
city engineering department engineers, creating P6Web dashboards, and
maintaining Project Portfolios; Planned projects from the planning phase
through construction, insuring proper activity logic structuring, percent
complete and duration types, and cost loading (resources and contracts) in
Primavera and Contract Manager for capital water infrastructure improvement
projects in excess of $200M; forecasted monthly expenditures and work
progress; creating trend notifications, change notifications, budget
reallocations, and profitability and loss reports; coordinating program and
project schedule costs input from A/E firms, multiple contractors, internal
teams, environmental and ROW departments while managing scheduling meetings
with the project teams; incorporated schedule and actual cost information
into the project and program schedules while developing and managing
processes and procedures for updating, analyzing, and monitoring schedules to
insure best practices. Analyzes critical paths, schedule logic, proper
resource allocations/leveling, monitor earned value (SPI/CPI), and create
analytical look-ahead reports, layouts, P6Web dashboards, and filters. Major projects
included the rehabilitation of the Pulgas Emergency Reservoir, the Harry
Tracy Water Treatment Plant (raw water pumping station with six horizontal
split-case pumps), the Baden Pumping Station (with three pumps driven by
electric induction motors), and the Crystal Springs pipeline (moving water
from the Crystal Spring Lower and Upper Reservoirs), and the San Andreas
pipeline (moving water from the San Andrea Reservoir to the Harry Tracy
Treatment Plant). Planned, developed, and managed from design through
construction in accordance to the WSIP’s program’s scope, time, and budget
including reporting and presenting their project status and earned value to
city and state agencies and construction contractors. BLACKWELL
CONSULTING (At State Farm
Insurance Companies) Chicago, IL, USA Project
Manager/Planner, February
2006 – July 2007 Managed projects
and master scheduled using Primavera P5 for multiple projects ranging in
budget from $250M to $25M for a national insurance firm. Was responsible for
identifying the project risks; developing and managing project integrated,
complex schedules utilizing Primavera and MS Project Server; maintaining
costs within baseline; updating schedules, resource allocations, and analysis
of schedule activity for variances in baselines; escalating potential issues
to project team and management; organizing and facilitating project planning
meetings to develop appropriate deliverables such as project charter, project
plan, change management control documents, Work Breakdown Structure (WBS),
Responsibility Assignment Matrices, and Schedule Network Diagrams; creating
reports detailing status, trend, variance, and forecasting of project
performance metrics such as Earned Value Analysis (EVA) and Burn Rate; and
analyzing complex problems, including diagnosis of root cause, cost and
schedule variances, schedule float, lag, schedule logic, proper duration and
percent complete types, and risk analysis to make independent judgments and
decisions required to resolve risks and issues. Used WBS ChartPro to convert
MS Project WBS structures to Primavera schedules. Projects focused on
software/database development and included scheduling and managing: A Claims Management
($25M) Test delivery Project involving 75 on- and off-site project resources
with multiple cross-functional dependencies on several application projects
in a Websphere/J2EE and DB2 infrastructure. Developed testing project
to design, create, and execute Use Case Paths using an Agile (Iterations)
Methodology. A Claims Management
($11M) Infrastructure project consisting of 80 resources that included
hardware, storage, operating systems, networks, development environment,
security, performance, availability, stability, processes and procedures that
support the infrastructure that produced a new upgraded Websphere/J2EE
architecture, several HP9000 Servers, and DB2. An upgrade and
delivery of a Test Requirements Database ($250K) project that involved 20 project
resources including outside vendors. Created Project Plan, identified
project risks/issues, managed scheduling, maintained costs and implemented
the project through the Test Delivery Organization. TEK Systems, Inc. (At DTE Energy
Corporation) Detroit, MI, USA Senior Project
Planner, June
2005 – February 2006 Planned various
projects for a public utility, reporting to 12 Project Managers in the IT
department. Responsibilities included facilitating project meetings for
project schedules in Primavera and MS Project for multiple projects
with a combined budget of $50M; represented the Project Management Office
(PMO) by providing project management analytical and support services
required by ITS clients; developed project schedules using Waterfall or Agile
Methodologies, conducted After Action Reviews and/or Lessons Learned
sessions; enforced PMBOK principles; coordinated with Information Technology
Group and SCADA Project Managers to develop Work Breakdown Structures (WBS),
Cost Allocations, and Resource Breakdown Structures (RBS) for projects by
reviewing Business Cases, the Project Charter, and Use Cases; analyzed
reports for the evaluation and management of Earned Value Analysis, Burn
Rate, budgets, activities, and resource allocations to ensure on time and in
budget implementation of best-in-class solutions; and developed and conducted
presentations utilizing Primavera’s MyPrimavera, Visio, PowerPoint, Excel and
Crystal Reports. Visteon Automotive
Systems Van Buren Township,
MI, USA Project Coordinator,
April
1994 – May 2005 Managed the
scheduling and execution of multiple major IT projects.
Responsibilities included project planning, managing, and delivering the $5M
Oracle legal database system for internal and external counsel; integrating
the Oracle application with SAP ERP to report legal financials to upper
management; coordinating internal and external technical and business
resources located at multiple sites; and planning and scheduling the
implementation or conversion of various mainframe and server-based legal
applications. Tools and
methodologies utilized include the Unified SDM methodology for departmental
projects; project planning using MS Project and/or Primavera P4; and
developing business/visual modeling for expected deliverables. Business
Requirements and GAP Analysis was used to determine time frames, funding
limitations, and procedures for accomplishing project requirements and goals. EDUCATIONAL
EXPERIENCE UNIVERSITY OF
LIBERIA, Bachelor’s of Science, Major: Business and Public Administration MONTCALM COLLEGE,
Associate’s of Science, Major: Liberal Arts PROJECT MANAGEMENT
INSTITUTE, Project Management Professional (PMP) Certified ScrumMaster (CSM) Certified
(Iterative framework for Agile methods) |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|